Grosvenor Gardens Health Care Flooring

Olivers Contracts played a pivotal role in the refurbishment of the historic Grosvenor Gardens property, providing superior flooring solutions that seamlessly merged modern functionality with its esteemed architectural heritage.

Project Overview

Olivers Contracts, a distinguished flooring contractor, was commissioned by Apollo Interiors for a pivotal role in the renovation project at Grosvenor Gardens Healthcare Belgravia. Tasked with replacing the outdated flooring with a modern yet period-appropriate solution, Olivers Contracts embraced the opportunity to contribute to the transformation of this prestigious medical clinic.

OC_icon_90blue
OC_icon_90blue

Project Scope

 

Our involvement in the project encompassed:

 

  1. Flooring Replacement:

Removing the old flooring and installing new wood-effect Amtico LVT flooring across all six floors of the Grade II listed Georgian property.

 

  1. Surface Preparation: Prior to installation, preparing the surfaces with high-quality primer, screed, and adhesive from Uzin UK to ensure optimal conditions for the new flooring.
  2. Collaborative Partnership: Working closely with Apollo Interiors to ensure seamless coordination and alignment with the overall vision for the clinic’s renovation.
  3. Quality Assurance: Maintaining the highest standards of craftsmanship and attention to detail throughout the installation process to achieve optimal results.
  4. Historical Sensitivity: Respecting the historical significance of the property by carefully integrating the new flooring while preserving its period charm.
Flooring for Grosvenor Gardens Healthcare Belgravia

Entrance flooring - Grosvenor Gardens Healthcare Belgravia

Challenges Faced

 

 

 Our team encountered several challenges during the project:

 

 

  1. Precision Removal: Safely and efficiently removing the old flooring without causing damage to the underlying structure or compromising the historical integrity of the property.
  2. Complex Installation: Executing the installation of wood-effect Amtico LVT flooring across multiple floors with varying layouts and dimensions, ensuring consistency and precision.
  3. Time Constraints: Adhering to tight deadlines to minimise disruption to the clinic’s operations while delivering high-quality results.

Resolution

 

Drawing upon our expertise and experience, Olivers Contracts successfully addressed these challenges:

 

  1. Methodical Approach: Implementing a meticulous removal process to protect the property and prepare the surfaces for the installation of the new flooring.
  2. Surface Preparation: Applying high-quality primer, screed, and adhesive from Uzin UK to ensure a stable and durable foundation for the new flooring.
  3. Skilled Execution: Deploying skilled craftsmen equipped with the necessary tools and techniques to ensure flawless installation across all floors.
  4. Efficient Project Management: Streamlining workflows and closely coordinating with Apollo Interiors to optimise efficiency and meet project milestones within the specified timeframe.
Lobby flooring in healthcare practice

Conclusion

 

The collaboration between Olivers Contracts and Apollo Interiors culminated in the successful revitalisation of Grosvenor Gardens Healthcare Belgravia. Our meticulous surface preparation and installation of wood-effect Amtico LVT flooring, supported by products from Uzin UK, not only enhanced the clinic’s aesthetic appeal but also contributed to its functional and historical integrity. The project stands as a testament to our commitment to excellence and our ability to deliver outstanding results in demanding environments.